top of page

Job Well Done

One of the key challenges faced on the journey to reopen the Sandy Creek Centre has been providing water to the toilet block. Due to equipment no longer being available on site because of the closure of the Sandy Creek Centre, the system used to pump water to the toilet block was no longer operational.

Finally after weeks and weeks of digging trenches, repairing pipes, replacing fittings and plenty of sweat we have working toilets on site!

One milestone passed....... bring on the next challenge!

CrossTrek

Journey / Challange / Adventure

A HUGE thanks to all who have volunteered their time helping to make this possible.


Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Search By Tags
No tags yet.
Follow Us
  • Facebook Black Square
  • Twitter Black Square
  • Google+ Black Square
bottom of page